Sport Fields



SUPREME COMMITTEE for DELIVERY & LEGACY, Qatar
Design & construction of 6 Nos Turf Football Pitches

compliant to FIFA standards
(2015/2016)

The scope of works includes but is not limited to
excavation, grading, drainage system, root-zone mix,br /> grassing, running track, artificial grass, irrigation system,
water tank, pump station, flood lighting, fencing,
maintenance services


ASPIRE ACADEMY, Qatar
Reconstruction complete of Football Pitch No. 7

(June/July 2011)

Scope of works (Turf area: 8,500 m2):
Removal of existing artificial grass, excavation and
disposal of existing sub-base materials, design and
installation of drainage system, installation of rootzone mix,
design and installation of a complete automatic irrigation system,
planting of certified Platinum TE Paspalum turf stolons airfreighted
from USA,
400-day guarantee period.




ASPIRE ACADEMY, Qatar
Installation of a new Irrigation System on 5 Football Pitches

(June/August 2011)

Scope of works (Turf area: 43,000 m2):
Design, supply and installation of a complete new
automatic irrigation system on Football Pitches Nos. 1 to 5,
including trenching in existing turf, HDPE pipe work,
stainless steel sprinklers with turf cup (175 nos), solenoid
valves (60 nos), satellite controllers (3 nos), electrical
master valves with flow sensor (5 nos), control wiring,
signal cable and electrical cable, radio connection to CCS,
testing and commissioning,
400-day maintenance period.



ASPIRE ZONE, Doha
Construction complete of Football Field No. 13
Design & Build Contract

(Completed in February 2014)

Construction complete of Football Field No. 13
(Design & Build Contract)

(Completed in February 2014)

Scope of works (Turf area: 9,125 m2):
Design, supply and installation of 1 new Football Field to
FIFA standards, including:

  • Excavation and grading works
  • “California drainage system”
  • Rootzone layer (mix of sand and PPC additive)
  • Grassing with imported stolons of Platinum TE Paspalum
  • Game accessories; marking of lines
  • Sectional panel tank (400 m3)
  • VSF Irrigation booster pump set complete
  • Automatic Irrigation System
  • Maintenance service after completion (400 days).