Hamad International Airport

HIA Access roads and terminals

Infrastructural Landscape Package (CP67)
Construction period: Mar 2012/Nov 2015
(Design and Build contract )
Total area: 1,890,000 m2

The scope of works includes:

  • Earthworks (592,000 m3)
  • Stone masonry low walls (16.6 km)
  • Stone aggregate paving (401,500 m2)
  • Stone features (6,900 m2)
  • Street furniture (170 Nos)
  • Planting soil (404,000 m3)
  • Trees and Palm trees (8,200 Nos)
  • Various plants (2,782,000 Nos)
  • Irrigation network (277 km)
  • Landscape lighting (4,100 Nos)
  • Erection of street lighting poles (1,565 Nos)
  • 24-month maintenance service