Lusail City, Marina Promenade

Lusail Marina District
East, South and North Promenades

Infrastructural Landscape Package
(Design and Build contract)
Construction period: Aug 2015/July 2017
Total area: 140,000 m2

The scope of works includes:

  • Design and Engineering
  • Earthworks; surface water drainage
  • Dewatering, piling, shoring
  • Structural civil work
  • Distribution of electrical power
  • Potable and Fire water network
  • 900 mm dia Irrigation main line
  • ELV-telecoms ducting
  • District cooling network
  • Pneumatic waste collection system
  • Gas network; Foul sewer
  • Fuel storage and supply facility
  • Floating fuel dock station
  • Hard landscape work
  • Street and landscape lighting
  • Dynamic water features
  • Soft landscape and irrigation system
  • 24-month operation and maintenance services