Doha North Sewage Treatment Work

DNSTW Buffer Zone Landscaping

Construction period: Jan 2015/Mar 2017
Total area: 8,300,000 m2
(Design and Build Sub-contract)

The scope of works includes:

  • Earthworks (1,165,500 m3)
  • Planting soil mix (320,000 m3)
  • Irrigation pipework (914 km)
  • Trees (95,000 Nos - 28 species)
  • Water ponds (276,500 m2)